Map the building functions that should interact and identify their existing control
platforms. Define operator goals and ownership before proposing automation so the
integration addresses a practical facility workflow.
Deliverable
Integration brief and system inventory.
Plan supported controllers, network connections and interfaces around approved building
functions. Document system boundaries and failure behaviour so the design remains
understandable when a component is unavailable.
Deliverable
Architecture diagrams and interface register.
Connect approved lighting controls to the supported automation environment. Coordinate
electrical work and lighting design with qualified parties while validating the intended
scenes and user controls.
Deliverable
Lighting interface map and scene tests.
Integrate supported shade controllers with the agreed room or building controls. Confirm
power, wiring and mechanical responsibilities before testing position, grouping and
scheduled operation.
Deliverable
Shade control schedule and functional checks.
Coordinate supported communication between the automation platform and the mechanical
controls provider. Preserve plant safety and specialist control responsibilities; test only
the agreed supervisory functions.
Deliverable
HVAC interface scope and coordination record.
Create approved combinations of lighting, shades and AV actions for common room uses. Keep
manual control available where designed and test transitions with the actual connected
equipment.
Deliverable
Scene schedule and user acceptance results.
Configure supported touch interfaces around the facility's operating tasks. Group
controls clearly and validate permissions and navigation with the people who will use the
system daily.
Deliverable
Control interface and operator walkthrough.
Connect supported occupancy inputs to approved lighting or room functions. Review sensor
placement and timeout behaviour, testing representative use without assuming detection is
suitable for every purpose.
Deliverable
Sensor map and automation test results.
Install approved gateways between compatible building or technology platforms. Document
protocol support, data points and ownership so the gateway's role is clear to both
technical teams.
Deliverable
Gateway configuration and point schedule.
Coordinate approved BACnet data exchange with the responsible building-controls provider.
Agree objects, access and update behaviour before testing, keeping specialist plant
programming outside the integration scope.
Deliverable
BACnet point mapping and interface tests.
Connect supported Modbus data points where the equipment and project design permit. Verify
register definitions, scaling and read/write permissions with the equipment provider before
using the values in workflows.
Deliverable
Register map and validation evidence.
Present available meter or equipment data through the approved platform. Document data
sources and interpretation limits rather than promising savings or treating an unverified
display as certified metering.
Deliverable
Dashboard configuration and data-source register.
Connect approved temperature, humidity or other supported sensors to the automation platform.
Confirm placement, calibration responsibility and alert ownership so readings are used
appropriately.
Deliverable
Sensor inventory and point verification.
Program agreed actions around facility operating schedules and exception dates. Test override
and recovery behaviour so a schedule change does not leave operators unable to control the
building.
Deliverable
Automation schedule and exception tests.
Integrate supported access or intrusion events with approved building functions. Define
permitted actions and confirm system ownership without introducing unsupported life-safety
behaviour.
Deliverable
Event-action matrix and integration evidence.
Connect supported meeting-room AV with room automation for coordinated user actions. Test
common sessions and document what remains manually controlled when a platform or network is
unavailable.
Deliverable
Room integration plan and scenario tests.
Define connectivity, addressing and equipment-space requirements for automation devices.
Coordinate with the network team so building technology is documented and support
responsibilities remain clear.
Deliverable
Device network schedule and connectivity checks.
Move approved automation functions to a supported replacement platform. Map existing
behaviour and pilot representative functions before changing a wider occupied facility.
Deliverable
Migration sequence and function reconciliation.
Investigate failed or inconsistent interactions across controllers, networks and connected
systems. Use event evidence and responsible-provider input to distinguish integration faults
from equipment or mechanical issues.
Deliverable
Diagnostic report and corrective actions.
Document installed interfaces, scenes and operating procedures for nominated users. Explain
support boundaries and approved override methods so facility teams can manage routine
operation confidently.
Deliverable
As-built control documents and training record.